Guide · The first version (MVP) What is an MVP, and how do you define a first version that proves your idea?
The first version is the hardest decision in most digital projects: what goes in, and what waits? This guide explains the idea, gives you a practical way to find the core loop, a test for what belongs in version one, and a success signal to write down before launch.
Summary
A minimum viable product (MVP) is the smallest version of your product that runs on real data and that real users can use, so it teaches you whether they need your idea and come back to it. Define it with one question: which loop has to be complete, from the first step to the last, before the user gets value? Anything that does not serve that loop waits, and everything you build should be able to carry the next feature.
- An MVP runs on real data and reaches real users. It is built to produce the learning that tells you what to do next.
- The core loop is the shortest path that starts with a user's need, ends with the value they came for, and is enough to test the idea.
- Before launch, write down one success signal, the number you will measure, and what you will do if it is met or missed.
What an MVP is, and how it differs from the alternatives
Eric Ries defines the minimum viable product as the version of a new product that lets a team collect the most validated learning about customers for the least effort. Learning is therefore the test, and the number of features follows from it.
A good first version answers a specific question. Will people request this service from their phones? Do they finish the request? Do they come back after the first one? Each question calls for a different version of the product.
The MVP is often confused with the stages around it. Nielsen Norman Group describes a UI prototype as a hypothesis, a candidate design solution for a specific problem. The table separates the stages by what each one proves:
| Stage | What it is | What it proves |
|---|---|---|
| Prototype | Clickable screens that simulate the journey, often with no working system behind them | That the journey makes sense and the screens are clear |
| Proof of concept | A small technical experiment that checks whether the hardest part of the idea can work | That the technology works |
| MVP | A complete core loop running on real data | That people need the loop and complete it |
| Full product | The roles, integrations and planned expansion that follow once the loop is proven | Sustainability and growth |
The test is what the version proves to a real user. A small version that runs on real data qualifies. Dozens of finished-looking screens that connect to nothing remain a prototype.
In our MVP development service we start with one question before any screen: what do we need to prove? Then we build the minimum that answers it, with a real backend and database from day one.
How to find the core loop
Every usable product is a loop: a need in one person, the steps they take, a value they receive, and a reason to finish and return. The core loop is the shortest path that delivers that value in full. To find it:
- Write the user's job in one sentence: "I want to ___, so that ___." For example: "I want to see a repair quote for my air conditioner without calling three technicians, so that I can choose with confidence."
- Map the steps from the need to the value. Do not add a step because it looks good, or because a competitor offers it.
- Remove each step in turn and ask whether the value disappears without it. What remains is the loop.
- Mark the moment the user receives something they can trust, such as a confirmation, an acceptance or a quote. That moment is the purpose of the loop.
Here is a real example. Al Mizan connects clients with licensed law offices in the Sultanate of Oman. Its core loop, as built: the client sends one request to several offices, every targeted office is notified, the first office to accept wins the request, a chat opens between the client and that office, and once the office completes the consultation, the client reviews it. That loop is what shows the idea works. Everything else is added on top of it, after it works.
The Naqrah.app project, a medical booking app in Muscat, applies the same method: a patient books an appointment, reschedules it, and collects points with every visit.
Write the loop as one sentence that the whole team agrees on. If it does not fit in a sentence, the team has not agreed on it yet.
What goes into version one and what waits
Once the loop is clear, scope gets easier. Ask whether a feature completes the loop directly, or makes a working loop better. The first kind goes into version one. The second kind waits on a written list that states why each item can wait.
- In: everything the loop needs to complete, from the first screen to the last, including the failed and unusual cases real users will hit, as well as the ideal path.
- In: access rules and permissions, meaning who sees what and who may move a request from one state to the next. These rules protect the loop once many people use it.
- In: an analytics event for each step, so that after launch you can see where people stop and where they succeed.
- In, when the loop depends on it: payments, notifications, maps. They arrive with the loop, on day one.
- Waits: advanced reports, loyalty points, extra integrations, and redesigns based on usage feedback, until use shows they earn their place.
If the loop ends with a request that a staff member must process, the screen where that person processes it is part of the loop itself, and belongs in version one.
Write the in-list and the waiting list, with a reason for each waiting item, before building starts, and hold to it. Anything added after launch comes once people have actually used the product, and it is recorded as a decision. We write this list with your team in the scoping session, before any design starts.
Set the success signal before launch
A first version launches to answer a question. If you do not write down the question, and what counts as an acceptable answer, you will read the result afterwards the way you would like to read it. Before you press publish, write three things:
- One behaviour that shows the idea works, such as the share of requests that reach an acceptance, or the share of users who get as far as the review. Download counts measure interest; they cannot show whether the loop works.
- A number you set yourself. We do not prescribe a universal figure. A reasonable threshold depends on the market and the service. What matters is writing it down before you see the result.
- A decision for each outcome. If the number is met, what happens next? If it is missed, what changes: the loop, the audience, or the channel? A written decision stops you from explaining away a result after it happens.
We prepare analytics events for each step at launch, so you can see what happens after publishing. Store assets are uploaded under your company account, and its requirements are settled early. Our guide on publishing under your company name explains them.
Three traps that recur in early projects
Each of these traps hits the loop at a different point.
Building more than the loop needs
The team starts with a reasonable list. Then a feature labelled "important later" joins it, then another because a competitor has one. Over time nobody can say which part of the product proves the idea. Read the sentence that describes the loop, and ask where each feature sits relative to it. If a feature has no place there, it goes on the waiting list.
A polished demo that cannot grow
The screens look like a product, but the data sits inside the screens and the rules are written into the interface. It shows everything well, then stops at the first real user. Test it with two questions: is the state saved in a database? And is each rule, such as a request being accepted only once, enforced on the server or in the screen? A rule that lives in the screen breaks as soon as a second screen or platform is added.
App stores look for this difference too. Apple's guidelines ask that an app include features, content and a UI that go beyond a repackaged website. Google Play's policy asks for a basic degree of functionality and a respectful user experience.
In Al Mizan, the most important rule, that the first office to accept wins, is enforced inside the database as one atomic step, so it stays intact when a new screen is added.
Postponing the admin side
The team manages orders today through WhatsApp messages and a spreadsheet, so the dashboard looks like a detail that can wait. But the loop breaks at the staff member, and the business rules spread outside the product, which makes them hard to bring together later. Build the dashboard to the extent that runs the loop every day: a list of requests, their states, and the main action for each state.
How version one grows without a rewrite
Growth without a rewrite rests on three decisions made at the start:
- The rules live in the database. Permissions, states and acceptance conditions are stored where a change of screen cannot alter them, so they hold when a new screen or platform is added.
- One backend serves every interface. The app, the website and the admin panel read the same logic, so the rules are not repeated in each one.
- Named analytics events from the start: request sent, accepted, chat opened, completed, reviewed. The names stay fixed when screens change, so results remain comparable between releases.
On that base, the next feature is added on top of what exists. Part of the loop is rewritten only when usage shows it needs a fundamental change, and the data makes that call when it appears. At Al Mizan, one app serves clients and offices, a separate web admin sits beside it, and the same rules in the database govern both sides.
That is the approach behind our MVP development service: a first version that launches, on a foundation that can grow.
Sources
- Eric Ries: Minimum Viable Product: a guide
- Nielsen Norman Group: UX Prototypes: Low Fidelity vs. High Fidelity
- Apple App Store Review Guidelines: 4.2 Minimum Functionality
- Google Play Developer Policy Center: Spam, Functionality, and User Experience
This guide gives general information for planning, dated at its last update. Your project's decisions need an assessment of their own, and you should check the current requirements of the stores and providers before you commit.
